At National Stadium in Warsaw we performed reinforced concrete construction.

Scope of works:

Reinforced concrete construction of staircases no. 1, 9, 10 with sliding technology.
- reinforcement and concreting of cores in constant manner in sliding formwork raised by actuators with performance of 10cm per hour.

Reinforced concrete construction of section 10
- assembly of prefabricated and comb beams for stands
- assembly of TT floor slabs with compressed concrete and “filigran” floor slabs
- stairs assembly
Reinforced concrete construction of two-floor underground parking under pitch level - sections 13,14,15,16
- slab area of around 24 000 m2
- assembly of prefabricated two-floor columns
- assembly of prefabricated beams
- assembly of  “filigran” floor slabs
- performance of monolithic slab with thickness of 60 cm for vehicle lifts for assembly of stands
Construction of reinforced concrete at external area
- assembly of prefabricated stairs
- performance of monolithic stairs
- performance of retaining walls along with construction of adjacent technical premises
- performance of monolithic ramp with construction of transformer station
- performance of DFA
Pitch level  - construction of monolithic slab of reinforced concrete.

 

Completion time: 2009-2012

Ordering Party: ALPINE-PBG-HYDROBUDOWA POLSKA Consortium.